Why two quotes for the same house can both be honest

A foundation repair quote is a price for a scope, and the scope is the part that varies. One contractor proposes ten push piers, another proposes eight helical piers and a wall brace, a third proposes monitoring the movement for a season first. The totals will differ, and none of the three is necessarily wrong. A homeowner who compares only the bottom line is comparing three different jobs.

Our permit data shows how much room there is for that. Inside a single city, the 25th and 75th percentile of declared value differ by a factor of 2.2 to 4.0. That is the spread of permitted repairs with a foundation-repair description, not of quotes for one house, so it overstates how much two quotes for the same scope should differ. It does show that "foundation repair" covers a lot of ground, and that a price alone cannot say whether a quote is reasonable.

Where the middle half of foundation repair permits fall, by city, 2023 to 2025
CityPermitsLowMedianHighHigh / low
Seattle273$18,650$28,000$41,2002.2x
San Francisco87$10,000$20,000$40,0004.0x
Miami79$9,550$15,000$21,0002.2x
Detroit76$6,500$13,000$20,2003.1x
Los Angeles331$7,500$13,000$30,0004.0x

Declared job value on single-family foundation repair permits, 25th percentile, median and 75th percentile, rounded to $50. Declared values can differ from the final bill. Miami figures come from unincorporated Miami-Dade County permits, not the City of Miami.

What the Federal Trade Commission tells you to do

The FTC's consumer guidance on home improvement is not specific to foundations, but it covers the estimate, the contract, the payment and the permit, which is most of what a homeowner has to get right. It says a written estimate should include a description of the work to be done, the materials, the completion date and the price. It says not to automatically choose the lowest bidder, and to ask for an explanation if there is a big difference among the estimates. It tells you to read the contract carefully, to make sure all blank spaces are filled in, to get any promises made in conversations or calls into the contract, and, even if your state does not require a written agreement, to ask for one.

On payment, the FTC advises not paying the full amount for the project up front, and never making the final payment until the work is done and you are satisfied with it. It notes that some states limit the amount a contractor can ask for as a down payment. It lists scammers as people who ask you to pay for everything up front or accept only cash. On who to hire, it says to consider only contractors who are licensed and insured, to confirm the license with your state or county, and to ask the contractor for proof of insurance. It also says that when you sign a contract at home or somewhere other than the seller's permanent place of business, the contract should include a written statement of your right to cancel within three business days.

Its home improvement page adds that the contract should include the contractor's name, address, phone number and license number and an estimated start and completion date, and that you should be wary if a contractor asks you to get any required building permits. The FTC also notes that contract requirements vary by state. Check the rules with your state licensing board or consumer protection office before you sign.

Make the quotes comparable: the scope checklist

Before you compare totals, ask every contractor to put the same items in writing. None of this is price data; it is what we found missing when we read the 846 permit descriptions behind this site, and it is the detail a second contractor would need to see to price the same job.

  • The method and the count. How many piers, braces, anchors or feet of wall, and what kind. Permit text rarely says: in Miami-Dade, 94% of the 79 permits we kept name no method at all, and in Los Angeles, only about 32 of 331 state a count we could read. A quote that does not say is a quote you cannot compare.
  • The design. Who designs the repair and whether an engineer stamps it. In Los Angeles, 111 of 331 permit descriptions mention an engineer. In Seattle, 267 of 273 say the work is "per plan". Ask whether the plan, the engineer and any inspection are in the price or extra.
  • The permit. Who files it, who pays the fee and whether the contractor will give you the permit number. Our data covers only permitted repairs, so it cannot say when a permit is optional. If a contractor says one is not needed, ask them to put that in writing and check with your city or county permit office.
  • What happens after the lift. Cracked drywall, sticking doors, plumbing and landscaping. Ask whether repairs after lifting are in the price. We do not publish a price for them because no permit data we can read separates them.
  • Related work. Drainage, gutters, interior waterproofing or a sump pump. In Detroit, 24 of 76 foundation permits mention waterproofing or a sump, so the bundle is common there and a quote with and a quote without are not the same job.
  • Warranty and monitoring. What is guaranteed, for how long, whether it transfers to a new owner and what voids it. We do not have data on warranties, so ask for the text of the warranty before you sign, not after.
  • Payment schedule. The deposit, the stages and the final payment. See the FTC advice above: no full payment up front, final payment only when you are satisfied.

Placing a quote against the permit range

Once the scope matches, the permit numbers are useful as a sanity check. Take your city's page if it is one of the five we cover: Seattle, San Francisco, Miami, Detroit and Los Angeles. The Miami page uses permits from unincorporated Miami-Dade County, not the City of Miami, so a City of Miami homeowner should treat it as a regional guide rather than a city figure. A quote inside the low-to-high range is unremarkable, and a quote near the median describes an ordinary permitted job in that city.

A quote above the high figure deserves a closer look at the scope: is it a whole-house job, and is the design, permit and post-lift work included? A quote below the low figure deserves the same look from the other side: is anything left out? Neither is proof of a problem. The permit range is a declared value, written on an application before the work starts, and it can differ from the final bill. Some are plainly round numbers: 60% of Los Angeles declared values are a multiple of $1,000. A quote can be above or below a permit median and still be fair.

If your city is not one of these, the pooled figure ($15,000 median, $9,550 to $30,000 for the middle half, 2023 to 2025) is a rough anchor, no more. It is the middle of the five areas pooled, not an average of the country, and Texas is not in it; our overview explains why.

Before you sign

Put your questions in an email so the answers are in writing. Compare the scope line by line before you compare totals, and ask the contractors with the largest differences to explain them: the FTC's advice is to ask for an explanation of a big difference among estimates, and a good contractor will have one. Confirm the license with your state or county and ask the contractor for proof of insurance, as the FTC suggests. Keep the contract, any change orders and your payment records together.

If your insurer might owe you something for the damage, ask before you commit; our guide on whether homeowners insurance covers foundation repair explains what to check in your policy and what to ask your insurer. And if the repair is about method rather than price, see cost by repair type and cost by job size for what permits can and cannot tell you. Prices here are ranges, not quotes: get written quotes before you sign.

Questions, answered

How many foundation repair quotes should I get?

The FTC advises getting multiple written estimates rather than relying on one, and asking for an explanation if there is a big difference among them. Its guidance on hiring a contractor says to get multiple estimates and does not set a number. Two or three written quotes with the same scope is a reasonable place to start.

Should I take the lowest quote?

Not automatically. The FTC says not to automatically choose the lowest bidder. A low quote can leave out the engineer, the permit or the repairs after lifting, so check what each quote includes before you compare totals.

Is a quote that matches the city median a fair price?

It is unremarkable, which is different from fair. A city median is the middle declared value of permitted repairs in that city, from 846 permits across four cities and unincorporated Miami-Dade County, and it mixes jobs of very different size. A quote at the median for a small job could be high, and the same number for a large job could be low. Compare scope first.

Who pulls the permit?

Ask each contractor in writing. The FTC lists it as a warning sign when a contractor asks you to get the required building permits yourself. Our data covers only repairs that were issued a permit, so it cannot tell you how often the work is done without one. Ask your city or county permit office whether your repair needs a permit.

What payment terms are reasonable?

The FTC says not to pay the full amount up front, to make the final payment only when the work is done and you are satisfied with it, and to be wary of contractors who ask you to pay for everything up front or accept only cash. It also notes that some states limit how much a contractor can ask for as a down payment, so check the rules with your state or local consumer protection office.